Coop, Pitlochry

 

Gow Groundworks were subcontracted by Dickie & Moore to stabilise the existing structures and banks of the Moulin Burn.  A detailed flood prevention design was implemented that involved concrete retaining walls and stone gabion baskets to prevent further erosion and control the water course.  There was also the added challenge of retaining the water flow to the Mill wheel down stream.  We also installed an interceptor with drainage system and resurfaced the car park.

Please watch our short time lapse film of the project.

https://vimeo.com/user25873713/review/189304496/cd39963dda

Project Value – £300K

 

Recent Projects

Parcel Force, Inverness

Gow Groundworks was sub-contracted by Kingsway Contractors to carry out drainage and resurfacing works at Parcel Force, Inverness.  

New House Site, Killin

Gow Groundworks completed drainage, foundation and concrete floor in Killin for a new house    

Resurfacing, Raigmore Hospital

Gow Groundworks was sub-contracted by Kier Construction to carry out resurfacing works at the entrance to Raigmore Hospital, Inverness.

Mast downtakings, Scotland

Gow Groundworks was sub-contracted by Balfour Beatty to take down telephone masts across Scotland and reinstate the area.  They carried More…