Parcel Force, Inverness
Gow Groundworks was sub-contracted by Kingsway Contractors to carry out drainage and resurfacing works at Parcel Force, Inverness.
T: 01847 831120 E: info@gowgroundworks.co.uk
Gow Groundworks were subcontracted by Dickie & Moore to stabilise the existing structures and banks of the Moulin Burn. A detailed flood prevention design was implemented that involved concrete retaining walls and stone gabion baskets to prevent further erosion and control the water course. There was also the added challenge of retaining the water flow to the Mill wheel down stream. We also installed an interceptor with drainage system and resurfaced the car park.
Please watch our short time lapse film of the project.
https://vimeo.com/user25873713/review/189304496/cd39963dda
Project Value – £300K
Gow Groundworks was sub-contracted by Kingsway Contractors to carry out drainage and resurfacing works at Parcel Force, Inverness.
Gow Groundworks was sub-contracted by Dickie & Moore Ltd to carry out refurbishment external works at Lidl stores in Giffnock, More…
Gow Groundworks completed drainage, foundation and concrete floor in Killin for a new house
Gow Groundworks was sub-contracted by Kier Construction to carry out resurfacing works at the entrance to Raigmore Hospital, Inverness.
Gow Groundworks was sub-contracted by Balfour Beatty to take down telephone masts across Scotland and reinstate the area. They carried More…